![CAISO to Extend Contract for Oil-fired Units in Bid to Ensure Reliability](https://www.powermag.com/wp-content/uploads/2017/09/stock_california_wikicommons.jpg)
Three 55-MW oil-fired units at Dynegy’s Oakland plant in renewables-heavy California will be needed through 2018 to ensure reliability in a region served by the California Independent System Operator (CAISO),…
Three 55-MW oil-fired units at Dynegy’s Oakland plant in renewables-heavy California will be needed through 2018 to ensure reliability in a region served by the California Independent System Operator (CAISO),…